A and B can do a work in 5 days B and C can do a work in 4 Days.A start the Work and leave after 4 Days Then B joined and left after 3 days .Remaining work done by C in how many Days
I Have tried:
A and B can do a piece of work in 1 Day is 1/5
similarly B and C is 1/4
After that I am not able to proceed with this sum, Please anyone guide me for the Answer
Answer
Suppose A,B,C does 1/x,1/y,1/z part of the in 1 day. Then
1/x+1/y=1/5 and 1/y+1/z=1/4.
Let C work for d days. Then by problem 4/x+3/y+d/z=1.
Now find the value of d using the constraints.